Now that they have the front edge, the back 2 rows had to be measured.
Each row has to be far enough back not to be shadowed by the one
in front of it on December 21st- 22nd.
By the end of Wednesday the 24 BP Solar SX120S
panels were mounted on the racks, ready to be tilted up.
Friday September 20th
the panels are tilted up and wiring begins.